Position: Project Consultant and Owner’s Engineer Services (2015-2016; 2018-cont.)
Position: Project Consultant and Owner’s Engineering (2017-cont.)
Position: Design and Preparation of Manufacturing Drawings of Downhole Pump Installation Platform
Position: BOP Project Designer and Owner’s Engineering Services (2017-2018)
Position: Project Consultant and Owner’s Engineering Services (2017-2018)
Position: Direct Contact Steam Condenser Design
Position: Mechanical Designer (2015)
Position: Project Consultant and Owner’s Engineering Services(2015-2016 )
Position: Power Plant Consultant (2015)
Position: Project Consultant and Owner’s Engineering Services (2016-2017)
Position: Mechanical Design and Projects of Re-Enjection Pump Station and Pipings of 30 MW Alaşehir-3 Geothermal Power Plant (Alaşehir GPP-3)
Position: Detecting and Solving Working Fluid (Butane) Leakage by Using Thermodynamic Calculations (2019)
Position: BOP Project Designer and Owner’s Engineering Services (2019-)
Position: NCG-Steam Pipeline Calculation
Position: Mechanical, Civil and Electrical BOP Design of Two Phase Pipeline (2021)
Position: BOP Project Design (2021)
Position: District Heating Project Designer (2015)
LATEST NEWS, ARTICLES AND MATERIALS THAT ABOUT SECTOR ARE IN THE BLOG PAGE